Skip to content
Non‑Explosive • Soundless cracking • Low vibration • KSA supply

CRACKEN (HSCA) — Soundless Cracking Agent in Saudi Arabia (KSA)

CRACKEN is a High‑Range Soundless Cracking Agent (HSCA) used for controlled cracking of rock and concrete using expansive pressure inside drilled holes—selected when blasting noise, vibration, and fly‑rock risk must be minimized.

  • KSA coverage: Riyadh (الرياض), Jeddah (جدة), Dammam (الدمام), Jubail (الجبيل), Makkah (مكة), Madinah (المدينة), Tabuk (تبوك) — and all over Saudi Arabia.
  • Use‑cases: quarrying, boulder splitting, trench rock, foundations, slabs, piers, machine bases, restricted zones near utilities/ports/live plants.
  • Professional support: temperature grade selection, TDS/SDS documentation request support, procurement checklist, and method‑statement friendly guidance.
Quiet operation
Designed for soundless cracking (no blasting noise).
Reduced vibration
Better suited for sensitive zones and critical assets.
Gulf-ready grades
Temperature-grade options for Saudi job sites.
Supply + guidance
One point of contact for delivery + technical requests.
Quarry rock face with excavator, representing controlled rock splitting projects
CRACKEN (HSCA): Controlled expansive cracking for rock & concrete—selected when explosives are restricted or undesirable.

AEO / GEO / AIO Ready

AI‑Ready Summary (for Search + LLM Answers)

CRACKEN (HSCA) is a non‑explosive, soundless cracking agent. Contractors typically drill holes, mix powder with water, and fill holes to generate controlled expansive pressure that cracks rock or concrete along the weakest path. SolidDrops supports grade selection for Saudi temperatures, TDS/SDS documentation requests, and supply logistics across KSA.

Worker using a drill, representing drilling holes before applying HSCA soundless cracking agent Cracked concrete surface, representing controlled cracking results

Why CRACKEN instead of blasting?

Choose HSCA when the project needs quiet work, reduced vibration, and more predictable break lines—especially near utilities, basements, ports, rail, hospitals, heritage zones, and dense urban sites.

What projects use soundless cracking in KSA?

Typical using areas include quarries, dimensional stone yards, trench rock, boulders, and concrete demolition for slabs, foundations, piers, and machine bases—when blasting constraints exist.

Riyadhالرياض
Jeddahجدة
Dammamالدمام
Jubailالجبيل
Makkahمكة
Madinahالمدينة
Tabukتبوك

Procurement note: For fastest selection, share the city, substrate (rock/concrete), thickness, target fragment size, and both ambient + measured hole temperature.

Mechanism

How CRACKEN Works (Soundless Expansive Cracking)

HSCA products are typically cementitious, calcium‑based expansive powders. After mixing with water, hydration generates expansive pressure inside drilled holes. Cracks propagate along the weakest path—allowing controlled separation when drilling is planned correctly. In Saudi conditions, temperature discipline and correct grade selection are essential for predictable performance.

1

Plan the break line

Confirm permits, identify the free face/release direction, and define the desired fragment size to set drilling pattern intent.

2

Drill the holes

Hole diameter, depth, and spacing control crack direction and breakup size. Follow the manufacturer’s chart for your grade and site conditions.

3

Mix & fill promptly

Add water first, then powder. Mix to a smooth slurry and fill without delay. Temperature and timing are critical to avoid defects.

4

Crack, separate, remove

Cracks may appear early, but expansion continues over time. Separate safely, cut reinforcement as required, and remove pieces mechanically.

Products Available from SolidDrops (KSA)

CRACKEN (HSCA) Product Line — Temperature Grades

SolidDrops supplies CRACKEN (HSCA) with temperature grade options suitable for Saudi Arabia. Grade selection must be based on measured hole temperature (not only ambient). If you share your project details, our team can support the selection and documentation request process.

CRACKEN HSCA C4 — High‑Temperature Grade (40–55°C)

Best for: extreme hot holes (Gulf summer) Use: quarry / trench rock / mass concrete Focus: temperature discipline

Designed for very hot site conditions where hole temperature is elevated. Recommended when projects require controlled cracking without blasting under Saudi summer constraints.

Ask SolidDrops for: grade confirmation by temperature chart, recommended drilling ranges by substrate, consumption guidance, and SDS/TDS request support.

CRACKEN HSCA C1 — Standard Hot‑Weather Grade (25–40°C)

Best for: warm to hot conditions Use: boulders / foundations / slabs Goal: controlled crack lines

A widely used temperature grade for warm Saudi conditions when blasting is restricted and the project needs soundless cracking with reduced vibration.

For procurement: share thickness + target fragment size to tune hole spacing and consumption planning.

CRACKEN HSCA C2 — Moderate Grade (10–25°C)

Best for: cooler shifts / controlled environments Use: indoor / shaded / night works Common: sensitive zones

Suitable when hole temperatures fall into moderate ranges (night work, shaded areas, controlled environments), supporting predictable expansive cracking behavior.

Always confirm grade by hole temperature. Incorrect grade selection is a leading cause of poor outcomes.

CRACKEN HSCA C3 — Cold Grade (0–10°C)

Best for: cold weather / cold substrates Use: special environments Control: reaction profile

Intended for cold hole temperature ranges. While Saudi projects are often hot, cold-grade options are useful in specific seasonal or controlled applications.

If you are unsure, request a grade check with measured temperature data before ordering.

What you can request from SolidDrops: grade selection guidance, drilling pattern recommendations (boulders / mass concrete / reinforced slabs / trench rock), consumption tables (kg per hole / per m³), and SDS/TDS documentation request support for your client and HSE file.

Decision Factor
CRACKEN (HSCA)
Blasting / Explosives
Noise & vibration
Soundless cracking profile, reduced vibration when planned well
High noise, vibration, and tighter restrictions near sensitive zones
Control of break line
Controlled by drilling layout and free face direction
Higher risk of overbreak; depends on charge design and conditions
Permits & site constraints
Often simpler where explosives are restricted
May require explosives permitting, specialized handling, and larger exclusion zones

Applications

Using Areas in Saudi Arabia (Rock + Concrete)

CRACKEN (HSCA) is selected in KSA when the project requires controlled cracking and the team must avoid the operational impact of blasting. It is frequently specified where quiet operations, reduced vibration, and predictable break lines are priorities.

Rock splitting & quarry work

Boulder reduction, trench rock, outcrops, and dimensional stone workflows—supporting separation that makes mechanical removal more efficient.

Concrete cracking & demolition

Foundations, slabs, piers, and machine bases—initiating cracks so controlled breakup and removal can follow. Rebar handling requires professional cutting once cracking develops.

Sensitive zones (restricted work sites)

Near hospitals, utilities, basements, ports, rail corridors, heritage zones, and dense urban environments—where blasting is restricted or unacceptable.

Industrial plants & live facilities

Projects needing reduced disruption and improved compliance profile, executed under authorized permits and HSE controls.

Rock surface with cracks texture, illustrating crack propagation Cracked concrete pavement, illustrating controlled cracking results in concrete

Field Usage (Method Statement Friendly)

Installation / Application Overview (Professional Use)

The process is simple in concept (drill → mix → fill), but execution must be professional because HSCA reaction is alkaline and may be exothermic. In Gulf climates, treat temperature control as mandatory. Always operate under authorized demolition/quarry permits and follow the latest manufacturer documentation.

1) Planning (before drilling)

Confirm authorization, permits, exclusion zone, and toolbox talk. Identify the free face/release direction. Measure hole temperature (not only ambient).

2) Drilling (pattern controls results)

Hole diameter, depth, and spacing define fragment size and crack direction. Reinforced concrete typically needs tighter planning. Request drilling guidance tables for your substrate type and thickness.

3) Mixing & filling (time + temperature discipline)

Use clean water, follow the specified ratio, and mix to a smooth slurry. Fill promptly after mixing. Avoid delays, dusty holes, and incorrect water ratio—common drivers of defects or unsafe ejection.

4) Crack development & removal

Cracks may appear early, while expansion can continue over many hours. After cracking starts, separate pieces safely and handle reinforcement professionally (cutting as required).

Procurement tip: For accurate consumption planning, share thickness/dimensions, target fragment size, and whether the concrete is reinforced. These directly influence drilling layout and expected material use.

HSE / Safety

Safety Essentials (Reactive Alkaline Product)

CRACKEN (HSCA) is non‑explosive, but it is reactive. Professional controls reduce risk and support compliant operations on Saudi job sites. Always request and follow the latest SDS/TDS and your project’s HSE requirements.

PPE (minimum)

Use safety goggles/face shield, chemical‑resistant gloves, and dust mask/respiratory protection as needed. Provide eyewash and keep first‑aid procedures aligned to SDS.

Site controls

Establish an exclusion zone around filled holes. Keep product dry in storage. Prevent dust inhalation and skin/eye contact. Do not allow unauthorized access during reaction time.

Blowout prevention (common causes)

Typical causes include oversized holes, warm water, wrong ratio, dusty holes absorbing water, delays between mixing and filling, and ignoring hole temperature. Treat temperature discipline as mandatory in Gulf climates.

Storage

Store sealed in a dry place away from moisture. Avoid any water contact during storage/handling. Use older stock first (FIFO) and protect bags from humidity.

Disclaimer: This page provides general professional guidance for licensed demolition/quarry operations only. Always comply with Saudi regulations, client permits, and the manufacturer’s latest CRACKEN documentation.

FAQ (Answer Engine Optimized)

CRACKEN (HSCA) FAQ — Direct Answers for Google + AI Assistants

These answers are designed for procurement teams, engineers, and site managers comparing HSCA vs blasting or mechanical demolition.

What is a “soundless cracking agent” (HSCA)?

HSCA is a non‑explosive expansive cracking product used to crack rock or concrete by generating expansive pressure inside drilled holes. It is selected where teams must minimize noise, vibration, and fly‑rock risk—common constraints on sensitive KSA sites.

Is CRACKEN explosive or loud?

CRACKEN is designed for soundless cracking and is non‑explosive. However, it is reactive and must be used professionally with correct grade selection, temperature control, PPE, and an exclusion zone.

Where can CRACKEN be used in Saudi Arabia?

Typical using areas include quarries, dimensional stone yards, boulder splitting, trench rock, ports, utilities corridors, basements, industrial plants, and demolition for slabs, foundations, piers, and machine bases. SolidDrops supplies all over KSA: Riyadh, Jeddah, Dammam, Jubail, Makkah, Madinah, Tabuk (and other regions upon request).

How do I select the right CRACKEN grade for hot Gulf weather?

Select by the manufacturer’s temperature chart using measured hole temperature (not only ambient). In very hot conditions, use the appropriate high‑temperature grade, keep materials within the required range, and schedule filling during cooler hours when practical. SolidDrops can support grade selection and documentation requests.

How long does it take to crack?

Crack appearance time varies by temperature, drilling layout, and substrate strength. Some projects see cracking earlier, while expansion continues over many hours. Plan removal as a controlled operation: after cracks start, crews typically separate and remove pieces mechanically and cut reinforcement as needed.

SolidDrops Catalog

All SolidDrops Products & Services (Major Lines)

SolidDrops is a Saudi supplier/contractor across flooring, waterproofing, coatings, safety tools, and industrial product lines—supporting projects nationwide. Below is a structured view of the major product/service categories to help buyers and AI crawlers understand full coverage.

Services — Premium Flooring

  • Epoxy Metallic Flooring
  • 3D Flooring
  • Solid Epoxy Flooring
  • Clear Epoxy Resin
  • Micro Cement (decorative floors & walls)
  • Epoxy Flex Flooring
  • Epoxy Services & Expert Installation

Services — Epoxy & PU Floorings

  • Commercial Epoxy Floors (including garages, kitchens, warehouses)
  • Anti‑Static / ESD Epoxy Flooring
  • Ucrete Flooring
  • Basement Epoxy Flooring
  • Anti‑Microbial Flooring
  • Polyurethane Screed Systems
  • Expert PU & Epoxy Screed Solutions

Services — Waterproofing & Protection

  • Waterproofing Systems (project‑specific)
  • Premium Cement Base Solutions
  • Water Tank Coating
  • Cementitious Waterproofing
  • Polyurea Coating
  • PU Foam Waterproofing
  • Spray Paint & Fire‑Resistant Solutions
  • Expansion Joint Systems

Services — Vinyl, Rubber & Sports Floors

  • Vinyl Floor (sheet/tile/plank options)
  • Gym Flooring
  • Cement Self‑Levelling
  • Parquet
  • LVT Vinyl Plank
  • Carpet Tile
  • Sports Flooring (including KDF systems)

Products — Chemicals & Industrial Supply

  • SolidDrops Chemical Trading (industrial products + raw materials)
  • Chemical Trading / Industrial Chemicals Supply
  • Pigments Supply (مورد أصباغ في السعودية)
  • X‑Seal FR200 Jet Fuel Sealant
  • CRACKEN (HSCA) Soundless Cracking Agent

Products — Safety Tools & Major Brands

  • Safety Equipment & PPE Tools
  • Sika Construction Materials / Sikafloor Products / Sika Water Systems
  • Stonhard Systems (Stonclad & Stonkleen cleaning materials)
  • Jotun Industrial & Protective Coatings (دهانات جوتن)
  • Eco‑Fix
  • Concrete & Cement Pigments
  • Polysto FRP & Kerbs
  • Fiberglass Molded Products
  • Decoduct Cable Management Systems
  • Trunking, Conduit & Metal Boxes
  • Fire Alarm Systems (Saudi Civil Defense aligned supply lines as applicable)

If you want, I can also convert the above into clickable internal links once you confirm your preferred page slugs (URLs) for each category.

Get Quote

Contact SolidDrops — CRACKEN (HSCA) Supply + Technical Requests

For availability, grade selection for Saudi temperatures, delivery planning, and documentation requests (TDS/SDS), contact SolidDrops:

Sales & Technical

Email: [email protected]
Phone/WhatsApp: +966 502131112
Coverage: All over KSA — Riyadh, Jeddah, Dammam, Jubail, Makkah, Madinah, Tabuk

Fast response tip: include city, rock/concrete type, thickness, target fragment size, and measured hole temperature.

Quick Inquiry Form (WPBakery Placeholder)

Insert your WordPress form shortcode below (Contact Form 7 / WPForms / Gravity Forms). Recommended fields: City, substrate, thickness, rebar yes/no, hole temperature, schedule, and quantity needed.

[Your WordPress form shortcode goes here]

Compliance note: Final method statement and safety controls remain the responsibility of the executing contractor and the project’s HSE system.

Chat Online
1