MMA Flooring in Jeddah: Silikal Fast-Curing Floors
SolidDrops supplies and installs Silikal MMA (methyl methacrylate) floors in Jeddah. Jeddah is SolidDrops’ head-office city, so MMA projects here are surveyed and supervised by the same team that specifies them.

Quick answer
SolidDrops supplies and installs Silikal MMA floors in Jeddah for hotel and central kitchens, food and beverage plants, cold stores and hospitals. MMA cures in about one hour after the last layer under suitable conditions, so kitchens and production lines can reopen after a short closure instead of days of downtime.
Key facts: MMA flooring in Jeddah
| Service | Silikal MMA flooring — supply and installation |
|---|---|
| City | Jeddah |
| Systems most used here | Kitchen System, System B Quartz SL, System D Cold Room, System C Flakes |
| Typical areas | Hotel, central and catering kitchens; food and beverage plants; cold stores and chillers; hospitals and clinics; restaurants and retail |
| Cure | About 1 hour to full mechanical and chemical resistance after the last layer (standard systems, suitable conditions) |
| Thickness range | 2–6 mm depending on system |
| Slip resistance | Up to R11–R13 (DIN 51130) with quartz builds |
| Applicator | SolidDrops, certified Silikal applicator |
Source: Silikal technical documentation for its standard MMA systems.
How a Silikal MMA quartz floor is built
Why MMA works in Jeddah
Coastal humidity and salt air
Jeddah’s humid, salty air is hard on cementitious toppings and grout lines. A sealed MMA floor with a closed topcoat leaves no joints for moisture and salts to work into.
Hotel kitchens that cannot close for long
Kitchens serving hotels in Jeddah and the pilgrim season in Makkah and Madinah run long hours. Because MMA cures fast, SolidDrops can lay a kitchen overnight or one zone at a time.
Cold stores and chillers
For chillers and freezers, the System D Cold Room build is rated from −25 to +45°C, so it can go into cold rooms with short shutdowns.
Food safety expectations
Jeddah’s food plants and hotel kitchens are audited for hygiene. Silikal systems are certified by HACCP International and comply with European Halal guidelines, which helps when the floor is part of an audit file.

Where SolidDrops installs MMA in Jeddah
- Hotel and central production kitchens in Jeddah, with projects in Makkah and Madinah planned from the Jeddah office.
- Food and beverage plants in Jeddah’s industrial areas, where System B Quartz SL suits wet and dry production.
- Cold stores and chillers serving Jeddah’s logistics and food distribution.
Recommended systems: Kitchen System · System B Quartz SL · System D Cold Room · System C Flakes · Hygienic floor coving · SolidDrops Care maintenance
How SolidDrops installs MMA in Jeddah
- Survey. We visit the site in Jeddah, check the slab, drains, moisture and the hours the area can close.
- System choice. We match the Silikal build to the use: kitchen, production, cold room, dry area or outdoor.
- Preparation. Old coatings or tiles are removed and the concrete is ground and repaired.
- Application. Primer, MMA layers and quartz or flakes are applied, with coving and drain details.
- Topcoat and handover. The topcoat seals the floor and the area is handed back with care instructions.
Compare Silikal MMA floor systems
| System | Best for | Thickness | Slip | Service temp. |
|---|---|---|---|---|
| System B Quartz SL | Wet and dry production, food processing | 3–5 mm | R11–R13 | 0 to +60°C |
| System B Quartz TA | Heavy mechanical and chemical load | 3–6 mm | R11–R13 | 0 to +60°C |
| Kitchen System | Hotel, hospital and central kitchens | 4–6 mm | R11–R13 | 0 to +60°C |
| System C Uni Colour | Dry areas: warehouses, pharma, corridors | 2–4 mm | Smooth | 0 to +60°C |
| System C Flakes | Retail, restaurants, schools, hospitals | 2–4 mm | R10 | 0 to +60°C |
| System D Cold Room | Cold rooms, chillers, freezers | 4–5 mm | R11–R13 | −25 to +45°C |
| System D Outdoor | External areas, moving substrates | 4–5 mm | R11–R13 | −25 to +45°C |
Manufacturer reference values for the standard builds. SolidDrops confirms the exact system for each project.
Buyer questions: MMA flooring in Jeddah
Do you install MMA flooring in Jeddah?
Yes. SolidDrops is a certified Silikal applicator with its head office in Jeddah, and supplies and installs Silikal MMA floor systems across the city.
Which MMA system is most used in Jeddah kitchens?
Commercial kitchens usually take the Silikal Kitchen System: a quartz MMA floor with a waterproofing membrane, 4–6 mm, with R11–R13 slip resistance.
How long does a kitchen in Jeddah need to close?
Silikal states that its standard MMA systems reach full mechanical and chemical resistance about one hour after the last layer under suitable conditions. SolidDrops plans the zones and timings after the site visit.
Can you also cover Makkah and Madinah?
Yes. Projects in Makkah and Madinah are surveyed and planned from the Jeddah office.
Does humidity in Jeddah affect MMA installation?
Site humidity, slab moisture and temperature are checked during the survey and before application, and the build is confirmed to suit the conditions on the day.
Plan your MMA floor in Jeddah
Send the area, current floor, photos and the time you can close. SolidDrops will recommend the Silikal system and send a quotation.
MMA Flooring in Saudi Arabia · Epoxy flooring Jeddah · Floor maintenance Jeddah
Written and reviewed by Ali Haider, Technical Consultant at SolidDrops, with 12 years of experience in industrial flooring and waterproofing systems across Saudi Arabia · SolidDrops is a certified Silikal applicator · Last updated 26 November 2026
